بدائل البحث:
custom algorithm » fusion algorithm (توسيع البحث), control algorithm (توسيع البحث), lasso algorithm (توسيع البحث)
coding algorithm » cosine algorithm (توسيع البحث), modeling algorithm (توسيع البحث), finding algorithm (توسيع البحث)
main component » main components (توسيع البحث), major component (توسيع البحث)
custom algorithm » fusion algorithm (توسيع البحث), control algorithm (توسيع البحث), lasso algorithm (توسيع البحث)
coding algorithm » cosine algorithm (توسيع البحث), modeling algorithm (توسيع البحث), finding algorithm (توسيع البحث)
main component » main components (توسيع البحث), major component (توسيع البحث)
-
1
The main components and data flow of the proposed algorithm.
منشور في 2025"…<p>The main components and data flow of the proposed algorithm.…"
-
2
-
3
-
4
-
5
-
6
-
7
-
8
Customer point clustering results.
منشور في 2025"…First, the paper systematically sorts out the classification and definition of no-fly zones as well as their impact mechanisms on UAV path planning, and elaborates on the theoretical basis of vehicle-UAV collaborative delivery, including the constituent elements of the problem, methods for quantifying customer satisfaction, and the application framework of heuristic algorithms. …"
-
9
Basic information of customer points.
منشور في 2025"…First, the paper systematically sorts out the classification and definition of no-fly zones as well as their impact mechanisms on UAV path planning, and elaborates on the theoretical basis of vehicle-UAV collaborative delivery, including the constituent elements of the problem, methods for quantifying customer satisfaction, and the application framework of heuristic algorithms. …"
-
10
Delayed schedule for key components.
منشور في 2025"…In this paper, for the C4 repair operation of the harmonious electric locomotive, using the preventive maintenance method, we constructed a multi-component maintenance plan optimization model with the aim of maximizing the availability, and solved it by using a heuristic genetic algorithm. …"
-
11
Key Component related parameters.
منشور في 2025"…In this paper, for the C4 repair operation of the harmonious electric locomotive, using the preventive maintenance method, we constructed a multi-component maintenance plan optimization model with the aim of maximizing the availability, and solved it by using a heuristic genetic algorithm. …"
-
12
-
13
-
14
Maintenance schedule for each component cycle.
منشور في 2025"…In this paper, for the C4 repair operation of the harmonious electric locomotive, using the preventive maintenance method, we constructed a multi-component maintenance plan optimization model with the aim of maximizing the availability, and solved it by using a heuristic genetic algorithm. …"
-
15
-
16
-
17
-
18
-
19
-
20