Search alternatives:
method algorithm » mould algorithm (Expand Search)
level scheduling » self scheduling (Expand Search)
tracking » training (Expand Search), taking (Expand Search)
element » elements (Expand Search)
method algorithm » mould algorithm (Expand Search)
level scheduling » self scheduling (Expand Search)
tracking » training (Expand Search), taking (Expand Search)
element » elements (Expand Search)
-
1
Scheduling and allocation in high-level synthesis using genetic algorithm
Published 1994Get full text
masterThesis -
2
Activity-level space scheduling
Published 1992“…Activity-level space scheduling involves allocating site space over time to static and dynamic construction resources such as robots. …”
Get full text
Get full text
Get full text
conferenceObject -
3
-
4
Improvement Algorithm for Limited Space Scheduling
Published 2001“…The model characterizes resource space requirements over time and establishes a time-space relationship for each activity in the schedule, based on alternative resource levels. An example illustrates the presented algorithm that generates a feasible space schedule.…”
Get full text
Get full text
article -
5
-
6
-
7
Scheduling and allocation in high-level synthesis using stochastic techniques
Published 2020“…In this work, a unique approach to scheduling and allocation problem using the genetic algorithm (GA) is described. …”
Get full text
article -
8
Efficient Dynamic Cost Scheduling Algorithm for Data Batch Processing
Published 2016Get full text
doctoralThesis -
9
Concurrent BIST Synthesis and Test Scheduling Using Genetic Algorithms
Published 2007“…This paper presents an efficient method for concurrent built-in self-test synthesis and test scheduling in high-level synthesis. The method maximizes concurrent testing of modules while performing the allocation of functional units, test registers, and interconnects. …”
Get full text
Get full text
Get full text
article -
10
Modified arithmetic optimization algorithm for drones measurements and tracks assignment problem
Published 2023“…In this work, several measurements are simulated during a time frame accompanied by the generation of several tracks using the Linear Kalman Filter. …”
Get full text
-
11
Efficient Dynamic Cost Scheduling Algorithm for Financial Data Supply Chain
Published 2021“…An iterative dynamic scheduling algorithm (DCSDBP) was developed to address the data batching process. …”
Get full text
article -
12
A Low-Cost Closed-Loop Solar Tracking System Based on the Sun Position Algorithm
Published 2019“…In summary, even for a small-scale solar tracking system, the algorithm-based closed-loop dual-axis tracking system can increase overall system efficiency. …”
-
13
-
14
-
15
Data of simulation model for photovoltaic system's maximum power point tracking using sequential Monte Carlo algorithm
Published 2024“…The model aims to compare the performance of classical perturb and observe (P&O) algorithm, particle swarm optimization (PSO) algorithm, flower pollination algorithm (FPA), and SMC-based tracking techniques. …”
Get full text
Get full text
Get full text
article -
16
Optimum sensors allocation for drones multi-target tracking under complex environment using improved prairie dog optimization
Published 2024“…This paper presents a novel hybrid optimization method to solve the resource allocation problem for multi-target multi-sensor tracking of drones. This hybrid approach, the Improved Prairie Dog Optimization Algorithm (IPDOA) with the Genetic Algorithm (GA), utilizes the strengths of both algorithms to improve the overall optimization performance. …”
Get full text
-
17
Learn while Tracking
Published 2007“…A simple non-iterative digital controller is proposed for the uniform output tracking problem of multi-input multi-output discrete-time varying linear systems with arbitrary relative degree. …”
Get full text
Get full text
Get full text
Get full text
conferenceObject -
18
MoveSchedule
Published 1995“…MoveSchedule establishes a time-space relationship for each activity in the schedule based on alternative resource levels so that tradeoffs between activity duration and space need on site are possible. …”
Get full text
Get full text
Get full text
masterThesis -
19
Meta-Heuristic Procedures for the Multi-Resource Leveling Problem with Activity Splitting
Published 2011Get full text
doctoralThesis -
20