Search alternatives:
10 decrease » _ decrease (Expand Search)
nn decrease » _ decrease (Expand Search)
27 10 » 7 10 (Expand Search), 20 10 (Expand Search), 25 10 (Expand Search)
10 decrease » _ decrease (Expand Search)
nn decrease » _ decrease (Expand Search)
27 10 » 7 10 (Expand Search), 20 10 (Expand Search), 25 10 (Expand Search)
-
281
Simulation and Optimization of an LNG Plant Cold Section
Published 2018“…Using the short cut method, optimization revealed that optimized MR composition resulted in almost 10% MR compression power and 6% plant operating cost savings, whereas new intermediate propane evaporation pressures, identified using detailed simulation, and flowrates decreased the propane compression power and operating costs by around 3.6%, and 2%, respectively. …”
Get full text
Get full text
-
282
Bench-scale and packed bed sorption of methylene blue using treated olive pomace and charcoal
Published 2006“…Batch tests showed that up to 80% of dye was removed when the dye concentration was 10 mg/ml and the sorbent concentration was 45 mg/ml. …”
Get full text
Get full text
-
283
-
284
-
285
-
286
-
287
-
288
-
289
-
290
-
291
-
292
Repositioning for pressure injury prevention in adults.
Published 2020“…The intervention was reported to be cost-saving compared with standard care (nursing time cost per patient EUR 206.60 versus EUR 253.10, incremental difference EUR -46.50, 95% CI EUR -1.25 to EUR -74.60). …”
Get full text
Get full text
-
293
-
294
-
295
-
296
-
297
Prediction of biogas production from chemically treated co-digested agricultural waste using artificial neural network
Published 2020“…The results demonstrated that co-digestion of ASWs with CM with a ratio of 70% to 30% produced the highest CMP of 334 ± 4 NL/kgVS in comparison with 230 ± 10 NL/kgVS for mono-digested substrate. The CMP was the highest for the substrate with moisture content (%MC) in the range of 34% to 48%, and it decreased for %MC > 50%. …”
Get full text
Get full text
-
298
-
299
Concentrated Solar Power Plant for Key Locations in Doha Qatar
Published 2017“…The suggested location of the CSP plant offers a site that is less than 10 km in distance from the targeted zones which means less transmission losses and transmission route cost. …”
Get full text
-
300