Showing 1 - 20 results of 29,782 for search '(( 50 ((ns decrease) OR (nn decrease)) ) OR ((( 19 p decrease ) OR ( _ step decrease ))))', query time: 0.50s Refine Results
  1. 1
  2. 2
  3. 3
  4. 4

    Forbush Decrease Catalog at MESSENGER by Emma Davies (12046748)

    Published 2022
    “…<p>For each Forbush decrease (Fd) identified, we list the associated ICME boundary times i.e. the ICME start, magnetic ejecta (ME) start, and the ICME end times in ISO standard. …”
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12
  13. 13
  14. 14
  15. 15
  16. 16
  17. 17

    Table of step height. by Jianbo Jia (717814)

    Published 2024
    “…Finally, by making corresponding test blocks, it was found that the peak value of forward resistance when the 10.5°test block crossed the steps of 1mm, 2mm and 3mm height decreased by 19.8%, 25.0% and 13.9% respectively, and the mean value decreased by 30.8%, 27.2% and 24.1% respectively, which was close to the simulation results, and verified the accuracy of the finite element analysis results.…”
  18. 18

    The well wall step. by Jianbo Jia (717814)

    Published 2024
    “…Finally, by making corresponding test blocks, it was found that the peak value of forward resistance when the 10.5°test block crossed the steps of 1mm, 2mm and 3mm height decreased by 19.8%, 25.0% and 13.9% respectively, and the mean value decreased by 30.8%, 27.2% and 24.1% respectively, which was close to the simulation results, and verified the accuracy of the finite element analysis results.…”
  19. 19
  20. 20