يعرض 641 - 660 نتائج من 1,764 نتيجة بحث عن '(( a (teer OR meet) decrease ) OR ( 10 ((nn decrease) OR (((a decrease) OR (mean decrease)))) ))*', وقت الاستعلام: 0.16s تنقيح النتائج
  1. 641

    Development of novel blend poly (Ethylene Glycol) / Poly(Ethersulfone) polymeric membrane using N-Methyl-2-Pyrollidone and dimethylformamide solvents for facilitating CO2/N2gas sep... حسب Juber, Fadel Abdul Hadi

    منشور في 2020
    "…Carbon dioxide (CO2) emissions have been the main cause for anthropogenic climate change. To meet the growing demand for CO2 removal, membrane separation technology using blend membranes is a promising and attractive alternative. …"
    احصل على النص الكامل
    احصل على النص الكامل
  2. 642
  3. 643
  4. 644
  5. 645
  6. 646
  7. 647
  8. 648
  9. 649

    Pd nanocrystals encapsulated in MOF-derived Ni/N-doped hollow carbon nanosheets for efficient thermal CO oxidation: unveiling the effect of porosity حسب Ipadeola, Adewale K.

    منشور في 2023
    "…The obtained Pd/Ni-MOF-HNC possesses hollow carbon sheets with a great surface area (153.05 m2 g−1), pore volume (0.12 cm3 g−1), rich Pd/Ni-Nx active sites, Ni-metal defects, rich N-content (7.53 at%), mixed Pd/Ni-oxide phases, and uniformly distributed ultra-small Pd nanocrystals (7.03 ± 1.10 nm); meanwhile, Pd/Ni-MOF-NC formed without etching had no porosity and less Ni-metal defects. …"
    احصل على النص الكامل
    احصل على النص الكامل
    احصل على النص الكامل
  10. 650

    Wind energy potential along the onshore and offshore Qatar حسب Mohammed, Aboobacker Valliyil

    منشور في 2020
    "…cant increase or decrease of wind power around Qatar in the last 40 years in most of the locations, while there is a slight decreasing trend in the o?…"
    احصل على النص الكامل
    احصل على النص الكامل
  11. 651
  12. 652
  13. 653
  14. 654
  15. 655
  16. 656

    Integrating Building Information Management (BIM) in Civil Infrastructure Coordination: Application at LUSAIL Plaza حسب Abotaleb, Mohab Mohamed

    منشور في 2020
    "…An exploratory approach on a complex mega-project case study (El-Sadek & McCabe, 2017), where the project team was coached on exploring the BIM model to identify any clash and discuss with the technical team to come up with adequate solutions, which was done by holding twice a week regular meetings. …"
    احصل على النص الكامل
    احصل على النص الكامل
  17. 657
  18. 658
  19. 659
  20. 660

    Dispatchable capacity optimization strategy for battery swapping and charging station aggregators to participate in grid operations حسب Mingze, Zhang

    منشور في 2023
    "…Also, the aggregator does not worsen the original power load while meeting the EV swapping demand and can decrease the daily load fluctuations by 0.65% and 12.89%, reduce the peak–valley difference by 5.81% and 7.80%, and increase the load rate by 3.67% and 4.08% in working and non-working day situations through providing the dynamic dispatchable capacity for the grid.…"
    احصل على النص الكامل
    احصل على النص الكامل
    احصل على النص الكامل
    article