بدائل البحث:
processing algorithm » modeling algorithm (توسيع البحث), routing algorithm (توسيع البحث), tracking algorithm (توسيع البحث)
means algorithm » search algorithm (توسيع البحث)
basic algorithm » based algorithm (توسيع البحث), magic algorithm (توسيع البحث), fastica algorithm (توسيع البحث)
data processing » image processing (توسيع البحث)
element means » element mesh (توسيع البحث)
data basic » data based (توسيع البحث), data base (توسيع البحث), data rasio (توسيع البحث)
processing algorithm » modeling algorithm (توسيع البحث), routing algorithm (توسيع البحث), tracking algorithm (توسيع البحث)
means algorithm » search algorithm (توسيع البحث)
basic algorithm » based algorithm (توسيع البحث), magic algorithm (توسيع البحث), fastica algorithm (توسيع البحث)
data processing » image processing (توسيع البحث)
element means » element mesh (توسيع البحث)
data basic » data based (توسيع البحث), data base (توسيع البحث), data rasio (توسيع البحث)
-
1
-
2
-
3
-
4
-
5
-
6
-
7
Schematic diagram of the experimental algorithm.
منشور في 2025"…Finite element and fatigue analyses are carried out for the key parameters of the structure, and deformation, fatigue and other data that appear in the actual operation process are obtained. …"
-
8
-
9
The Basic architecture of the model.
منشور في 2025"…This paper emphasizes the importance of data cleaning, pre-processing, and applying appropriate methodologies to transform raw data into a valuable resource that can be utilized by ML and AI models. …"
-
10
-
11
The run time for each algorithm in seconds.
منشور في 2025"…The goal of this paper is to examine several extensions to KGR/GPoG, with the aim of generalising them a wider variety of data scenarios. The first extension we consider is the case of graph signals that have only been partially recorded, meaning a subset of their elements is missing at observation time. …"
-
12
-
13
-
14
-
15
The relevant code in the manuscript can be found in the supporting information data file.
منشور في 2025الموضوعات: -
16
-
17
-
18
CRITIC weight calculation results for corporate operational risk warning indicators.
منشور في 2025الموضوعات: -
19
-
20