Search alternatives:
method algorithm » network algorithm (Expand Search), means algorithm (Expand Search), mean algorithm (Expand Search)
boruta algorithm » forest algorithm (Expand Search)
elements method » element method (Expand Search)
code algorithm » cosine algorithm (Expand Search), novel algorithm (Expand Search), modbo algorithm (Expand Search)
data code » data model (Expand Search), data came (Expand Search)
method algorithm » network algorithm (Expand Search), means algorithm (Expand Search), mean algorithm (Expand Search)
boruta algorithm » forest algorithm (Expand Search)
elements method » element method (Expand Search)
code algorithm » cosine algorithm (Expand Search), novel algorithm (Expand Search), modbo algorithm (Expand Search)
data code » data model (Expand Search), data came (Expand Search)
-
81
-
82
-
83
-
84
-
85
Contactless Mobile Payment Framework and Software Application: Computer Programming Code and Data
Published 2025Subjects: -
86
-
87
-
88
-
89
-
90
-
91
-
92
-
93
Multi-material topology optimization using scaled boundary finite element method
Published 2025“…<p>This work introduces the use of Scaled Boundary Finite Element Method (SBFEM) in Multi-Material Topology Optimization (MMTO) problems, which is new in the literature. …”
-
94
-
95
-
96
-
97
-
98
-
99
Code and data for "A reduced-scale adaptive morphing vehicle prototype with enhanced aerodynamic efficiency"
Published 2025“…<p dir="ltr">This dataset contains:</p><ul><li>CAD files for the design and fabrication of the proposed adaptive morphing vehicle prototype;</li><li>Computer programs for genetic-algorithm-based autonomous optimization;</li><li>Raw data acquired in the wind tunnel experiments for demonstrating and validating the morphing vehicle prototype and optimization algorithm; and</li><li>Computer codes for post-processing and visualizing raw data.…”
-
100
Overview of the C&CG method.
Published 2025“…The model is solved iteratively using the column generation algorithm and strong duality theory. Case studies on a Northeast China power grid demonstrate that, by optimally configuring generation and storage capacity guided by flexibility and other indicators, the proposed method reduces curtailment/load shedding costs and system flexibility insufficiency probability by 45% and 4.3% respectively. …”