Showing 1 - 20 results of 394 for search '(( final three process optimization algorithm ) OR ( binary data driven optimization algorithm ))', query time: 0.65s Refine Results
  1. 1
  2. 2
  3. 3

    The ANFIS algorithm details. by Mohammadmahdi Taheri (21722285)

    Published 2025
    “…The existence of uncontrollable factors affects the decision-making process, which is a problem for investors who are responsible for the final financial decisions on how to allocate their budgets to financial assets in their investment portfolios. …”
  4. 4
  5. 5
  6. 6

    Workpiece processing information. by Guilin Yang (583364)

    Published 2024
    “…Finally, in order to further verify the algorithm’s applicability in actual production processes, it was applied to solve scheduling problems in three flexible workshop scenarios and an aviation engine job shop scheduling in an enterprise. …”
  7. 7

    The Search process of the genetic algorithm. by Wenguang Li (6528113)

    Published 2024
    “…Firstly, the dataset was balanced using various sampling methods; secondly, a Stacking model based on GA-XGBoost (XGBoost model optimized by genetic algorithm) was constructed for the risk prediction of diabetes; finally, the interpretability of the model was deeply analyzed using Shapley values. …”
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12
  13. 13
  14. 14

    Optimization results for fitness. by Ronghua Meng (20978441)

    Published 2025
    “…Finite element and fatigue analyses are carried out for the key parameters of the structure, and deformation, fatigue and other data that appear in the actual operation process are obtained. On the basis of stable egg carrying, a carrying motion mathematical model is established, and the genetic algorithm (GA) is chosen to optimize the structural parameters. …”
  15. 15
  16. 16
  17. 17
  18. 18
  19. 19

    Algorithm parameters. by Guilin Yang (583364)

    Published 2024
    “…Finally, in order to further verify the algorithm’s applicability in actual production processes, it was applied to solve scheduling problems in three flexible workshop scenarios and an aviation engine job shop scheduling in an enterprise. …”
  20. 20