-
261
-
262
-
263
Remote Thermal Water Leakage Sensor With a Laser Communication System
Published 2020Get full text
article -
264
-
265
Assessing the Impact of Reactive Power Droop on Inverter Based Microgrid Stability
Published 2021Get full text
article -
266
A Comparative Study of Energy Performance in Educational Buildings in the UAE
Published 2021Get full text
article -
267
HBN Nanoparticle-Assisted Rapid Thermal Cycling for the Detection of Acanthamoeba
Published 2020Get full text
article -
268
-
269
-
270
-
271
-
272
-
273
FE modeling of concrete beams and columns reinforced with FRP composites
Published 2021Get full text
article -
274
-
275
Assessment of High-resolution Local Emissions and Land-use in Air Quality Forecasting at an Urban, Coastal, Desert Environment
Published 2022“…The model’s forecast accuracy was assessed against measurement data from five ground air quality monitoring stations in the greater metropolitan area of Doha over a one-month period. …”
-
276
The Effects of Online Formative and Summative Assessment on Test Anxiety and Performance: A Study Among First-Year Undergraduate Students at A Higher Education Institution in Abu D...
Published 2019“…The presented study was conducted to provide greater insight into the potential positive, neutral and/or negative effects of online formative and summative assessment on test anxiety and performance. …”
Get full text
-
277
Novel paclitaxel formulations solubilized by parenteral nutrition nanoemulsions for application against glioma cell lines
Published 2016“…The zeta potential of linoleic had a greater negative value than that of Intralipid.Loading efficiencies for paclitaxel were 70.4–80.2% and 44.2–57.4% for Clinoleic and Intralipid formulations, respectively. …”
Get full text
Get full text
Get full text
article -
278
SYSTEM DYNAMICS APPROACH FOR WHOLE LIFE CYCLE COST MODELLING OF RESIDENTIAL BUILDING PROJECTS IN UNITED ARAB EMIRATES
Published 2020“…Simulated costs under adjusting risks' levels can be presented in the same exported data sheet. All cash flow scenarios, under three cost risks levels, can be trended in the same chart, simultaneously, including all project's lifecycle time steps. …”
Get full text
-
279
-
280