-
1
-
2
-
3
Factors Associated with Meeting Current Recommendation for Physical Activity in Scottish Adults with Diabetes
Published 2019“…Furthermore, meeting the recommended physical activity levels decreased with age (OR 0.96; 95% CI 0.95–0.97), having a longstanding illness (OR 0.56; 95% CI 0.34–0.93) and body mass index (OR 0.94; 95% CI 0.92–0.97), but increased with higher fruit and vegetable intake (OR 1.16; 95% CI 1.07–1.25) and mental wellbeing (OR 1.04; 95% CI 1.02–1.06). …”
-
4
The Role of Project Management Soft Skills in Increasing Project Success
Published 2017“…As the world economy shifts towards an increasingly globalised market, the degree of competition becomes a more significant challenge which organisations face. …”
Get full text
-
5
Do Older Adults with Multimorbidity Meet the Recommended Levels of Physical Activity? An Analysis of Scottish Health Survey
Published 2019“…Also, meeting recommended PA decreased with age [OR 0.92 (95% CI 0.90–0.94)] and body mass index [OR 0.93 (95% CI 0.91–0.95]; but increased per additional portion of fruit and vegetables taken [OR 1.19 (95% CI 1.12–1.25)] and with increase in well-being scale score [OR 1.05 (95% CI 1.03 to 1.06)]. …”
-
6
Potential of horizontal louvers in increased energy savings in a commercial building in Dubai
Published 2018“…This dissertation investigates the use of horizontal louvers in increasing the energy efficiency of an office cabin in Dubai, facing south direction. …”
Get full text
-
7
Comparative cost analysis of Lebanon's hospitality services
Published 1998“…A study which compares the costs of hospitality services in Lebanon versus its neighbouring tourism rival nations; analyses the causes of such high costs; and offers suggestions leading to a halt in price increase or possibly price reduction strategies is presented. …”
Get full text
Get full text
Get full text
article -
8
Life Cycle Cost Analysis as a Technique to Reduce Project’s Cost Overruns of Assets in UAE: A Case Study-Based Research
Published 2011“…These cost overruns represent 7.7% of the total allocated budget for the 13 projects, and if all the projects were studied, the percentage might increase further. …”
Get full text
-
9
-
10
Comparative cost assessment of sustainable energy carriers produced from natural gas accounting for boil-off gas and social cost of carbon
Published 2020“…Mathematical approach is used to calculate production and transportation costs of these energy carriers and to account for BOG as a unit cost within the total cost. …”
-
11
Cost and Sustainability Optimization of Desalinated Water Supply Chains
Published 2023Get full text
doctoralThesis -
12
The political determinants of the cost of equity: Evidence from Privatization
Published 2012“…We find robust evidence that the cost of equity is increasing in government ownership. …”
Get full text
article -
13
The Influence of Risks on the Cost Overrun of ICT Network Projects
Published 2018“…The researcher also identified the various cost over-run factors that could hamper the ICT adoption process. …”
Get full text
-
14
Deep learning-based modeling of land use/land cover changes impact on land surface temperature in Greater Amman Municipality, Jordan (1980–2030)
Published 2024“…This study aimed to model past, present, and future LULCC on Land Surface Temperatures in the Greater Amman Municipality (GAM) in Jordan between 1980 and 2030. …”
-
15
Cost-benefit analysis for the installation of cogeneration CSP technology in Cyprus
Published 2013“…The results indicate that the electricity unit cost or benefit for both cases of electricity purchasing tariff are decreased or increased with the increase of the capacity factor and the capacity size of the plant. …”
Get full text
article -
16
The influence of risks on the outturn cost of ICT infrastructure network projects
Published 2021“…Purpose The internet of things (IoT) is becoming an increasingly inescapable part of society. IoT paradigm cannot function without the networking infrastructure. …”
Get full text
Get full text
-
17
Modeling of tri-parameter contracts integrating cost, time and risk
Published 2014Get full text
doctoralThesis -
18
A Framework for Project Time-Cost Optimization Considering Float Consumption Impact
Published 2012Get full text
doctoralThesis -
19
SYSTEM DYNAMICS APPROACH FOR WHOLE LIFE CYCLE COST MODELLING OF RESIDENTIAL BUILDING PROJECTS IN UNITED ARAB EMIRATES
Published 2020“…Both cost and risk impacts are linearly increasing during OPEX lifetime. …”
Get full text
-
20
Study of Life Cycle Cost Analysis and Value Engineering and their use in UAE
Published 2021“…Including the three main phases: initial cost, operation & maintenance cost and decommissioning cost. …”
Get full text