    Concurrent BIST Synthesis and Test Scheduling Using Genetic Algorithms by Harmanani, H. M.

    Published 2007
    “…The method is based on a genetic algorithm that efficiently explores the testable design space and finds a sub-optimal test registers assignment for each k-test session. …”
    Get full text
    Get full text
    Get full text
    article
  3. 3

    Activity-level space scheduling by Zouein, Pierrette P.

    Published 1992
    “…Activity-level space scheduling involves allocating site space over time to static and dynamic construction resources such as robots. …”
    Get full text
    Get full text
    Get full text
    conferenceObject
  4. 4
  5. 5

    Improvement Algorithm for Limited Space Scheduling by Zouein, Pierrette

    Published 2001
    “…The model characterizes resource space requirements over time and establishes a time-space relationship for each activity in the schedule, based on alternative resource levels. An example illustrates the presented algorithm that generates a feasible space schedule.…”
    Get full text
    Get full text
    article
  6. 6
  7. 7

    Scheduling and allocation in high-level synthesis using stochastic techniques by Sait, Sadiq M.

    Published 2020
    “…In this work, a unique approach to scheduling and allocation problem using the genetic algorithm (GA) is described. …”
    Get full text
    article
  8. 8
  9. 9

    Efficient Dynamic Cost Scheduling Algorithm for Financial Data Supply Chain by Al Sadawi, Alia

    Published 2021
    “…An iterative dynamic scheduling algorithm (DCSDBP) was developed to address the data batching process. …”
    Get full text
    article
  10. 10

    A multi-class discriminative motif finding algorithm for autosomal genomic data. (c2015) by Wehbe, Gioia Wahib

    Published 2016
    “…In addition, implementing feasible computational methods for such enormous data is by itself another challenge. …”
    Get full text
    Get full text
    masterThesis
  11. 11
  12. 12

    MoveSchedule by Zouein, Pierette

    Published 1995
    “…MoveSchedule establishes a time-space relationship for each activity in the schedule based on alternative resource levels so that tradeoffs between activity duration and space need on site are possible. …”
    Get full text
    Get full text
    Get full text
    masterThesis
  13. 13
  14. 14

    Implementation and Comparison of Particle Swarm Optimization and Genetic Algorithm Techniques in Combined Economic Emission Dispatch of an Independent Power Plant by Shahbaz Hussain (9765320)

    Published 2019
    “…Two contemporary metaheuristic techniques, particle swarm optimization (PSO) and genetic algorithm (GA), have were simultaneously implemented for combined economic emission dispatch (CEED) of an independent power plant (IPP) situated in Pakistan for different load demands. …”
  15. 15
  16. 16
  17. 17

    On-site workshop investment problem: A novel mathematical approach and solution procedure by Nima Moradi (19418821)

    Published 2023
    “…However, considering the OSW, which has not been addressed in the project scheduling problems, requires the construction site to have a space capacity constraint while considering the workshop size, availability level, and other project-related constraints. …”
  18. 18

    Deep Reinforcement Learning for Resource Constrained HLS Scheduling by Makhoul, Rim

    Published 2022
    “…High-level synthesis (HLS) scheduling, an NP-hard problem, is a process that auto-mates VLSI design and is a very important step in silicon compilation. …”
    Get full text
    Get full text
    Get full text
    masterThesis
  19. 19

    A novel approach for real time flows scheduling by Fawaz, W.

    Published 2006
    “…A plethora of packet-scheduling algorithms have been proposed in the literature in order to meet the stringent time constraints of real time flows at an IP router level. …”