Search alternatives:
level scheduling » self scheduling (Expand Search)
data algorithm » jaya algorithm (Expand Search), deer algorithm (Expand Search)
mean algorithm » deer algorithm (Expand Search), search algorithm (Expand Search)
element » elements (Expand Search)
level scheduling » self scheduling (Expand Search)
data algorithm » jaya algorithm (Expand Search), deer algorithm (Expand Search)
mean algorithm » deer algorithm (Expand Search), search algorithm (Expand Search)
element » elements (Expand Search)
-
1
Scheduling and allocation in high-level synthesis using genetic algorithm
Published 1994Get full text
masterThesis -
2
Activity-level space scheduling
Published 1992“…Activity-level space scheduling involves allocating site space over time to static and dynamic construction resources such as robots. …”
Get full text
Get full text
Get full text
conferenceObject -
3
-
4
Improvement Algorithm for Limited Space Scheduling
Published 2001“…The model characterizes resource space requirements over time and establishes a time-space relationship for each activity in the schedule, based on alternative resource levels. An example illustrates the presented algorithm that generates a feasible space schedule.…”
Get full text
Get full text
article -
5
-
6
Scheduling and allocation in high-level synthesis using stochastic techniques
Published 2020“…In this work, a unique approach to scheduling and allocation problem using the genetic algorithm (GA) is described. …”
Get full text
article -
7
Efficient Dynamic Cost Scheduling Algorithm for Data Batch Processing
Published 2016Get full text
doctoralThesis -
8
Concurrent BIST Synthesis and Test Scheduling Using Genetic Algorithms
Published 2007“…This paper presents an efficient method for concurrent built-in self-test synthesis and test scheduling in high-level synthesis. The method maximizes concurrent testing of modules while performing the allocation of functional units, test registers, and interconnects. …”
Get full text
Get full text
Get full text
article -
9
Efficient Dynamic Cost Scheduling Algorithm for Financial Data Supply Chain
Published 2021“…An iterative dynamic scheduling algorithm (DCSDBP) was developed to address the data batching process. …”
Get full text
article -
10
Variable Selection in Data Analysis: A Synthetic Data Toolkit
Published 2024“…Variable (feature) selection plays an important role in data analysis and mathematical modeling. This paper aims to address the significant lack of formal evaluation benchmarks for feature selection algorithms (FSAs). …”
Get full text
article -
11
MoveSchedule
Published 1995“…MoveSchedule establishes a time-space relationship for each activity in the schedule based on alternative resource levels so that tradeoffs between activity duration and space need on site are possible. …”
Get full text
Get full text
Get full text
masterThesis -
12
-
13
Meta-Heuristic Procedures for the Multi-Resource Leveling Problem with Activity Splitting
Published 2011Get full text
doctoralThesis -
14
UniBFS: A novel uniform-solution-driven binary feature selection algorithm for high-dimensional data
Published 2024“…UniBFS exploits the inherent characteristic of binary algorithms-binary coding-to search the entire problem space for identifying relevant features while avoiding irrelevant ones. …”
-
15
Sensitivity analysis and genetic algorithm-based shear capacity model for basalt FRC one-way slabs reinforced with BFRP bars
Published 2023“…Finally, a design equation that can predict the shear capacity of one-way BFRC-BFRP slabs was proposed based on genetic algorithm. The proposed model showed the best prediction accuracy compared to the available design codes and guidelines with a mean of predicted to experimental shear capacities (V<sub>pred</sub>/V<sub>exp</sub>) ratio of 0.97 and a coefficient of variation of 17.91%.…”
-
16
Auto-indexing Arabic texts based on association rule data mining. (c2015)
Published 2015“…Our model denotes extracting new relevant words by relating those chosen by the previous classical methods, to new words using data mining rules. …”
Get full text
Get full text
masterThesis -
17
The Use of Microwave Tomography in Bone Healing Monitoring
Published 2019Get full text
doctoralThesis -
18
Estimating Construction Project Duration Using a Machine Learning Algorithm
Published 2024Get full text
Get full text
Get full text
masterThesis -
19
A Framework for Predictive Modeling in Sustainable Projects
Published 2012Get full text
doctoralThesis -
20
On-site workshop investment problem: A novel mathematical approach and solution procedure
Published 2023“…However, considering the OSW, which has not been addressed in the project scheduling problems, requires the construction site to have a space capacity constraint while considering the workshop size, availability level, and other project-related constraints. …”