Search alternatives:
significant projection » significant production (Expand Search), significant proportion (Expand Search), significant protective (Expand Search)
projection based » projections based (Expand Search), prediction based (Expand Search), project based (Expand Search)
point decrease » point increase (Expand Search)
significant projection » significant production (Expand Search), significant proportion (Expand Search), significant protective (Expand Search)
projection based » projections based (Expand Search), prediction based (Expand Search), project based (Expand Search)
point decrease » point increase (Expand Search)
-
21
-
22
-
23
-
24
-
25
The project steps.
Published 2023“…<div><p>Background</p><p>This project aimed to assess compliance with evidence-based criteria’ for the prevention and management of workplace violence against nursing staff in Shahid-Beheshti hospital, Maragheh, Iran. …”
-
26
-
27
-
28
-
29
-
30
-
31
-
32
-
33
-
34
Table_1_Phenotypic Clumping Decreases With Flock Richness in Mixed-Species Bird Flocks.DOCX
Published 2021“…Using a null model approach, we found that small flocks were more phenotypically clumped for body size than expected by chance; however, phenotypic clumping decreased as flocks increased in size and approached expected phenotypic variation in large flocks. …”
-
35
-
36
Architectural model of construction projects.
Published 2025“…<div><p>Prefabricated buildings face greater and different prefabricated components throughout their entire lifecycle, leading to a significant increase in management difficulty. This article proposes an evaluation method based on a multi-layer complex network model combined with an improved topsis. …”
-
37
Structural model of construction projects.
Published 2025“…<div><p>Prefabricated buildings face greater and different prefabricated components throughout their entire lifecycle, leading to a significant increase in management difficulty. This article proposes an evaluation method based on a multi-layer complex network model combined with an improved topsis. …”
-
38
Analysis process of the specific project.
Published 2025“…<div><p>Prefabricated buildings face greater and different prefabricated components throughout their entire lifecycle, leading to a significant increase in management difficulty. This article proposes an evaluation method based on a multi-layer complex network model combined with an improved topsis. …”
-
39
-
40