يعرض 1 - 20 نتائج من 1,399 نتيجة بحث عن '((algorithm within) OR (algorithm both)) function', وقت الاستعلام: 0.36s تنقيح النتائج
  1. 1

    Comparison of different algorithms. حسب Dawei Wang (471687)

    منشور في 2025
    "…<div><p>In this study, the optimization of construction machinery scheduling within roadbed construction projects is explored, taking into account both personnel fatigue and sequence-dependent setup times. …"
  2. 2

    Study proposed algorithm. حسب Ainhoa Pérez-Guerrero (21377457)

    منشور في 2025
    "…The index of microvascular resistance (IMR) is a specific physiological parameter used to assess microvascular function. Invasive coronary assessment has been shown to be both feasible and safe. …"
  3. 3

    Multi-algorithm comparison figure. حسب Dawei Wang (471687)

    منشور في 2025
    "…<div><p>In this study, the optimization of construction machinery scheduling within roadbed construction projects is explored, taking into account both personnel fatigue and sequence-dependent setup times. …"
  4. 4
  5. 5
  6. 6

    Accelerated MPC Algorithms and Augmented System Design for Legged Robots حسب John Ndegwa Nganga (21088838)

    منشور في 2025
    "…The approach is powered by a newly introduced algorithm, named the modified Recursive Newton Euler Algorithm~(mRNEA), which is inspired by classical RNEA, and computes the dynamics information pre-multiplied with a fixed vector. …"
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12
  13. 13
  14. 14
  15. 15

    Overall process planning. حسب Dawei Wang (471687)

    منشور في 2025
    "…<div><p>In this study, the optimization of construction machinery scheduling within roadbed construction projects is explored, taking into account both personnel fatigue and sequence-dependent setup times. …"
  16. 16

    Model intrinsic parameter flow. حسب Dawei Wang (471687)

    منشور في 2025
    "…<div><p>In this study, the optimization of construction machinery scheduling within roadbed construction projects is explored, taking into account both personnel fatigue and sequence-dependent setup times. …"
  17. 17

    A comparison of whether to add a penalty. حسب Dawei Wang (471687)

    منشور في 2025
    "…<div><p>In this study, the optimization of construction machinery scheduling within roadbed construction projects is explored, taking into account both personnel fatigue and sequence-dependent setup times. …"
  18. 18

    The interleaved processes. حسب Dawei Wang (471687)

    منشور في 2025
    "…<div><p>In this study, the optimization of construction machinery scheduling within roadbed construction projects is explored, taking into account both personnel fatigue and sequence-dependent setup times. …"
  19. 19

    Final optimization results. حسب Dawei Wang (471687)

    منشور في 2025
    "…<div><p>In this study, the optimization of construction machinery scheduling within roadbed construction projects is explored, taking into account both personnel fatigue and sequence-dependent setup times. …"
  20. 20

    Vehicle-related parameters. حسب Dawei Wang (471687)

    منشور في 2025
    "…<div><p>In this study, the optimization of construction machinery scheduling within roadbed construction projects is explored, taking into account both personnel fatigue and sequence-dependent setup times. …"