Search alternatives:
implementing » implemented (Expand Search)
implementingeding » implementededing (Expand Search)
implementingedingeding » implementededingeding (Expand Search)
Showing 261 - 280 results of 1,405 for search '(complementary OR (implementing OR (implementingeding OR implementingedingeding))) systems', query time: 0.11s Refine Results
  1. 261

    In-Vehicle Performance Validation of the Semi-Active Hybrid Energy Storage System by Rehman, Habib-ur

    Published 2015
    “…A hybrid energy storage system (HESS) consisting of high-energy-density batteries and high-power-density Ultra-capacitors (UCs) can perform better than a battery alone powering an Electric Vehicle. …”
    Get full text
    article
  2. 262

    A decision support system for automating document retrieval and citation screening by Raymon van Dinter (10521952)

    Published 2021
    “…A Multi-Channel CNN architecture is implemented to support the citation screening process. …”
  3. 263

    An Intelligent and Low-Cost Eye-Tracking System for Motorized Wheelchair Control by Mahmoud Dahmani (18810247)

    Published 2020
    “…The system input is images of the user’s eye that are processed to estimate the gaze direction and the wheelchair was moved accordingly. …”
  4. 264
  5. 265

    Physical Layer Security of Dual-Hop Hybrid FSO-mmWave Systems by Saud Althunibat (16888722)

    Published 2023
    “…The comparable supported data rate and the complementary characteristics in different weather conditions of both links, i.e., FSO and mmWave) have attracted research efforts towards analyzing the different performance aspects of hybrid FSO-mmWave systems. …”
  6. 266

    Investigating the Effectiveness and Teachers’ Perceptions of Rigorous Curriculum Design for Project-Based Learning Implementation on Middle School Science Students’ Achievement and... by ASSAF, NOURA FOUAD

    Published 2023
    “…Since countries’ educational systems accountability is currently evaluated based on student’s achievements in external benchmark assessments and while students are still underperforming in benchmark assessments particularly Measure of Academic Progress (MAP) in the United Arab Emirates (UAE) this study aimed to Investigate the Effectiveness and Teachers’ Perceptions of RCD for PBL Implementation on Middle School Science Students’ Achievement and MAP scores in a Private School in Abu Dhabi, UAE. …”
    Get full text
  7. 267
  8. 268
  9. 269

    Stochastic Simulation Model For Maintenance Manpower Planning by Duffuaa, S. O.

    Published 2020
    “…The results indicated that that the simulation model is realistic and a valuable tool for planning manpower in maintenance system systems.…”
    Get full text
    article
  10. 270

    Design of an echo canceller for acoustic halls by Akin, Ilke Levent

    Published 1993
    “…A major problem in many public address systems of large halls is the poor perception of message due to multiple reflections-echoes-in the hall. …”
    Get full text
    masterThesis
  11. 271
  12. 272
  13. 273

    A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units by El-Amin, I.

    Published 2020
    “…The algorithm was developed, implemented and tested on an integrated model for the MS problem. …”
    Get full text
    article
  14. 274

    Impact Of Inspection Errors On The Performance Measures Of A General: Repeat Inspection Plan by Duffuaa, S. O.

    Published 2020
    “…Multi-characteristic critical components exist in many systems. Such components may be a part of an aircraft, spac shuttle or a gas ignition system. …”
    Get full text
    article
  15. 275

    A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units by Duffuaa, S. O.

    Published 2020
    “…The algorithm was developed, implemented and tested on an integrated model for the MS problem. …”
    Get full text
    article
  16. 276
  17. 277
  18. 278
  19. 279
  20. 280

    A Stackelberg Game Theory Model for Integrated Community Energy Storage Systems by Sobhan Dorahaki (20545670)

    Published 2024
    “…However, the distribution system operator must account for the potential reduction in the CES system’s operational profit to incentivize the CES owner to participate in the flexibility enhancement program.…”