بدائل البحث:
implementing » implemented (توسيع البحث)
implementingingedingedingeding » implementedingedingedingeding (توسيع البحث)
يعرض 1,141 - 1,160 نتائج من 1,405 نتيجة بحث عن '(complementary OR (implementing OR implementingingedingedingeding)) systems', وقت الاستعلام: 0.10s تنقيح النتائج
  1. 1141

    Enablers and Barriers to Knowledge sharing in the UAE infrastructural projects حسب MOHAMED ALI AHMED, ALDHANHANI

    منشور في 2018
    "…The results appear to show that respondents believed that two enablers are relevant to the effectiveness of KS between stakeholders at each stage of the projects lifecycle: sufficient reward systems to share knowledge (E4) and sufficient assets and resources to support project KS processes (E12). …"
    احصل على النص الكامل
  2. 1142

    Injury burden in individuals aged 50 years or older in the Eastern Mediterranean region, 1990–2019: a systematic analysis from the Global Burden of Disease Study 2019 حسب Samar Al-Hajj (8967641)

    منشور في 2022
    "…Dedicated efforts should be implemented to devise injury prevention strategies that are appropriate for older adults and cost-effective injury programmes tailored to the needs and resources of local health-care systems, and to curtail injury-associated risk and promote healthy ageing.…"
  3. 1143

    ASIC design with AHPL حسب Sait, Sadiq M.

    منشور في 1994
    "…The AHPL language is used as the frontend specification medium due to its closeness to hardware implementation issues. The system is modular and technology independent so that future extensions and specific implementation issues can be added/modified…"
    احصل على النص الكامل
    احصل على النص الكامل
    article
  4. 1144

    "Speed Control of a 3-Phase Induction Motor Based on Robust Optimal Preview Control Theory" حسب Shwehdi, M. H.

    منشور في 2006
    "…The optimal preview controlled system is implemented, and its applicability and robustness are demonstrated by computer simulation and experimental results.…"
    احصل على النص الكامل
    article
  5. 1145

    Applying School-Based Management in UAE Governmental Schools حسب Hussein, Mohamed Fathi

    منشور في 2011
    "…Results suggest acceptance from different parties involved in SBM implementation providing that (a) there would be several pre-implementation professional development courses for involved parents, administrators, and teachers participating in the new school governance system. …"
    احصل على النص الكامل
  6. 1146

    Designing ASICs with UAHPL حسب Sait, Sadiq M.

    منشور في 1995
    "…The UAHPL language is used as the front-end specification medium because of its close relation to hardware implementation issues. The system is modular and technology independent so that future extensions and specific implementation issues can be added and modified. …"
    احصل على النص الكامل
    احصل على النص الكامل
    article
  7. 1147

    The Effect of Barkley’s Behavior Management Principles on a child with ADHD in a Lebanese inclusive classroom حسب Oweini, Ahmad

    منشور في 2013
    "…Barkley’s behavior management principles for students with ADHD developed and implemented in a second grade inclusive classroom through a system of behavior modification techniques are studied in this project. …"
    احصل على النص الكامل
    احصل على النص الكامل
    article
  8. 1148

    Evaluation of new pavement technologies in Nevada حسب Bazi, G.M.

    منشور في 2003
    "…In light of the field performance data that have been developed on the use of PG grading system with Hveem mixtures, it is recommended that any implementation of the Superpave PG grading system in Nevada should be accompanied with specific requirements on the use of polymer modification process. …"
    احصل على النص الكامل
    احصل على النص الكامل
    احصل على النص الكامل
    conferenceObject
  9. 1149

    Lean management adoption level in middle eastern manufacturing facilities حسب El-Khalil, Raed

    منشور في 2013
    "…Lean manufacturing (LM) process, also known as Toyota Production System (TPS) or lean management, provides tools and methods that focus on eliminating waste and adding value to assembly and manufacturing operations. …"
    احصل على النص الكامل
    احصل على النص الكامل
    احصل على النص الكامل
    article
  10. 1150

    Microcontroller-based multi-language clock-calendar حسب Al-Ali, A.R.

    منشور في 1993
    "…A single-chip microcontroller-based Arabic, Chinese, English and Hindi clock-calender system is developed and implemented. The system is designed and programmed in such a way that it enables the user to select the desired numerical system and set the corresponding time and date. …"
    احصل على النص الكامل
    احصل على النص الكامل
    article
  11. 1151
  12. 1152

    A New Parallel Genetic Algorithm Model حسب Al-Somani, Turki F.

    منشور في 2020
    "…This paper presents an implementation of three Genetic Algorithm models for solving a reliability optimization problem for a redundancy system with several failure modes, a modification on a parallel a genetic algorithm model and a new parallel genetic algorithm model. …"
    احصل على النص الكامل
    article
  13. 1153

    Knowledge Management Practices in UAE Construction Sector حسب GHABBOUR, MOSTAFA

    منشور في 2017
    "…The main purpose of this study to (1) investigate the awareness level of the concept of Knowledge Management (KM) in the construction industry in United Arab Emirates (UAE) andthe important benefits of using KM system in both employees and organization, (2) explore the resources required to implement KM initiatives (3)identify the main barriers to KM implementation and (4) identify the critical KM adoption success factors. …"
    احصل على النص الكامل
  14. 1154

    COACT: a query interface language for collaborative databases حسب Mershad, Khaleel

    منشور في 2017
    "…We define a set of UPA keywords that are used as a part of the history tracking mechanism to select specific versions of a data item, and a set of UPA options that select specific versions based on possible future decisions of PIs. We implemented our query interface mechanism on top of Apache Phoenix, taking into consideration that the UPA system was implemented on top of Apache HBase. …"
    احصل على النص الكامل
    احصل على النص الكامل
    احصل على النص الكامل
    احصل على النص الكامل
    article
  15. 1155

    Identification and Prioritization of Green Lean Supply Chain Management Factors Using Fuzzy DEMATEL حسب Md. Ismail Hossain (11649066)

    منشور في 2023
    "…The fuzzy decision-making trial and evaluation laboratory (fuzzy DEMATEL) approach is employed to analyze these factors to implement GLSCM effectively. This research identifies capacity utilization, green purchasing, and demand variation as the most influential factors in GLSCM, while quality improvement and the Kanban system are considered the least important factors. …"
  16. 1156

    Global incidence, prevalence, years lived with disability (YLDs), disability-adjusted life-years (DALYs), and healthy life expectancy (HALE) for 371 diseases and injuries in 204 co... حسب Alize J, Ferrari

    منشور في 2024
    "…Data were extracted from vital registration systems, verbal autopsies, censuses, household surveys, disease-specific registries, health service contact data, and other sources. …"
    احصل على النص الكامل
    احصل على النص الكامل
    احصل على النص الكامل
    article
  17. 1157

    Modeling and validating the class security model using alloy حسب Haraty, Ramzi A.

    منشور في 2013
    "…Formalizing security models provide system designers and security engineers with evidence that they are constructing a consistent system that will meet the specifications as implemented. …"
    احصل على النص الكامل
    احصل على النص الكامل
    احصل على النص الكامل
    conferenceObject
  18. 1158
  19. 1159

    Impact of Energy Efficiency Practices on Healthcare Financial Profitability: Case Study of Al-Gardens Hospital Jordan, Middle East حسب AHMAD, MAYSAM

    منشور في 2023
    "…The research assumes that lighting control system as operational practice can reduce energy efficiency with 21% of the total energy consumption and 1 year and 4 weeks payback period, and the window to wall ratio considered as the most energy efficient and feasible building envelop practice to be implement with energy savings of 6% of the yearly energy consumption kwh/year and payback period of 0.46 year. …"
    احصل على النص الكامل
  20. 1160

    Quantification of energy produced from an evacuated tube water heater in a real setting حسب Houri, Ahmad

    منشور في 2013
    "…For the first time, actual data regarding an evacuated tube SWH has been collected from an implemented system in Lebanon. The data collected was based on a number of sensors installed at various points in the system. …"
    احصل على النص الكامل
    احصل على النص الكامل
    احصل على النص الكامل
    article