Showing 1 - 20 results of 1,275 for search 'algorithm b function', query time: 0.15s Refine Results
  1. 1

    (a) Radar chart of these algorithms (23 Benchmark functions), (b) The sorting diagram of these algorithms (23 Benchmark functions). by Yu Liu (6938)

    Published 2025
    “…<p>(a) Radar chart of these algorithms (23 Benchmark functions), (b) The sorting diagram of these algorithms (23 Benchmark functions).…”
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10

    <b>Opti2Phase</b>: Python scripts for two-stage focal reducer by Morgan Najera (21540776)

    Published 2025
    “…Where available, repository links are provided:</p><ol><li><b>NumPy</b>, version 1.22.1</li><li><b>SciPy</b>, version 1.7.3</li><li><b>PyGAD</b>, version 3.0.1 — https://pygad.readthedocs.io/en/latest/#</li><li><b>bees-algorithm</b>, version 1.0.2 — https://pypi.org/project/bees-algorithm</li><li><b>KrakenOS</b>, version 1.0.0.19 — https://github.com/Garchupiter/Kraken-Optical-Simulator</li><li><b>matplotlib</b>, version 3.5.2</li></ol><p dir="ltr">All scripts are modular and organized to reflect the design stages described in the manuscript.…”
  11. 11

    Flowchart of proposed algorithm. by Tibebu Legesse (21030014)

    Published 2025
    “…Moreover, the proposed algorithm significantly extends network lifetime, with a <b>3.5%</b> and <b>7.5%</b> improvement over EAPS-AODV and AODV. …”
  12. 12
  13. 13

    Flowchart of DAPF-RRT algorithm. by Zhenggang Wang (1753657)

    Published 2025
    “…<div><p>In response to the widely used RRT-Connect path planning algorithm in the field of robotic arms, which has problems such as long search time, random node growth, multiple and unsmooth path turns, a path planning algorithm combining dynamic step size and artificial potential field is proposed. …”
  14. 14

    Performance comparison of different algorithms. by Zhenggang Wang (1753657)

    Published 2025
    “…<div><p>In response to the widely used RRT-Connect path planning algorithm in the field of robotic arms, which has problems such as long search time, random node growth, multiple and unsmooth path turns, a path planning algorithm combining dynamic step size and artificial potential field is proposed. …”
  15. 15
  16. 16
  17. 17
  18. 18
  19. 19

    Iteration curve of each algorithm: (a) Convergence curves of the average best fitness for functions F1-F10, (b) Convergence curves of the average best fitness for functions F11-F20 and (c) Correspondence between curve colors and algorithms. by Ruyi Dong (9038174)

    Published 2025
    “…<p>Iteration curve of each algorithm: (a) Convergence curves of the average best fitness for functions F1-F10, (b) Convergence curves of the average best fitness for functions F11-F20 and (c) Correspondence between curve colors and algorithms.…”
  20. 20