Integrated Single Vendor Single Buyer Model With Stochastic Demand And Variable Lead Time
In this paper, we consider the single vendor single buyer integrated production inventory problem. We relax the assumption of deterministic demand and assume that the lead time is varying lineraly with the lot size. The lead time is composed of a lot size-dependent run time and constant delay times...
Saved in:
| Main Author: | |
|---|---|
| Other Authors: | , |
| Format: | article |
| Published: |
2020
|
| Subjects: | |
| Online Access: | https://eprints.kfupm.edu.sa/id/eprint/2478/1/integrated_production_maintenance_and_qu_ben_daya_isi_000081557800002.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|