Activity-level space scheduling
Activity-level space scheduling involves allocating site space over time to static and dynamic construction resources such as robots. The resulting coarse layouts pertaining to activity-related time intervals serve to coordinate the motion planning of multiple robots. This cannot be done with existi...
محفوظ في:
| المؤلف الرئيسي: | |
|---|---|
| مؤلفون آخرون: | |
| التنسيق: | conferenceObject |
| منشور في: |
1992
|
| الوصول للمادة أونلاين: | http://hdl.handle.net/10725/8635 http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php http://www.iaarc.org/publications/fulltext/Activity-level_space_scheduling.PDF |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
| الملخص: | Activity-level space scheduling involves allocating site space over time to static and dynamic construction resources such as robots. The resulting coarse layouts pertaining to activity-related time intervals serve to coordinate the motion planning of multiple robots. This cannot be done with existing motion planning tools, as computational demands make path-planning for multiple robots in dynamic environments prohibitively expensive. An interactive and graphical decision-support tool, named MovePlan, is presented to assist in space scheduling. Its output layouts can be used to refine individual robot's trajectories using traditional path-planning algorithms. |
|---|