Activity-level space scheduling

Activity-level space scheduling involves allocating site space over time to static and dynamic construction resources such as robots. The resulting coarse layouts pertaining to activity-related time intervals serve to coordinate the motion planning of multiple robots. This cannot be done with existi...

Full description

Saved in:
Bibliographic Details
Main Author: Zouein, Pierrette P. (author)
Other Authors: Tommelein, Iris D. (author)
Format: conferenceObject
Published: 1992
Online Access:http://hdl.handle.net/10725/8635
http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php
http://www.iaarc.org/publications/fulltext/Activity-level_space_scheduling.PDF
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Activity-level space scheduling involves allocating site space over time to static and dynamic construction resources such as robots. The resulting coarse layouts pertaining to activity-related time intervals serve to coordinate the motion planning of multiple robots. This cannot be done with existing motion planning tools, as computational demands make path-planning for multiple robots in dynamic environments prohibitively expensive. An interactive and graphical decision-support tool, named MovePlan, is presented to assist in space scheduling. Its output layouts can be used to refine individual robot's trajectories using traditional path-planning algorithms.