Simulating and comparing various price-driven bid selection methods from an owner's perspective. (c2017)
In the construction industry, it is crucial for owners to select the appropriate contract delivery method in order to achieve best performance on their projects. The low bid method has been the most common competitive bid selection approach used for public projects in the U.S. construction industry...
Saved in:
| Main Author: | Ammoury, Michael Fayez (author) |
|---|---|
| Format: | masterThesis |
| Published: |
2017
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/10725/7189 https://doi.org/10.26756/th.2018.40 http://libraries.lau.edu.lb/research/laur/terms-of-use/thesis.php |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Modeling of tri-parameter contracts integrating cost, time and risk
by: Rabie, Mohamad M.
Published: (2014) -
An illusion of freedom. (c2017)
by: Hashem, Farrah AL
Published: (2017) -
Mapping corruption in public roads construction in Lebanon. (c2019)
by: Saba, Rami Elias
Published: (2019) -
Unilateral Termination of Construction Contract - A Comparative Study between Chinese Law and UAE Law
by: Yin, Zhe
Published: (2015) -
Construction Contract Administration Performance Assessment Tool by Using a Fuzzy Structural Equation Model
by: Murat Gunduz (16875960)
Published: (2020)