Skip to content
VuFind
  • Login
    • English
    • اللغة العربية
Advanced
  • Schematic diagram and process...
  • Cite this
  • Text this
  • Email this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
  • Save to List
  • Permanent link
Schematic diagram and process of construction for a bridge in Shanxi Province.

Schematic diagram and process of construction for a bridge in Shanxi Province.

<p>Schematic diagram and process of construction for a bridge in Shanxi Province.</p>

Saved in:
Bibliographic Details
Main Author: Juan Li (146180) (author)
Other Authors: Rengye Zhao (18840587) (author), Shengliang Cao (18840590) (author)
Published: 2025
Subjects:
Biophysics
Biochemistry
Cell Biology
Biotechnology
Biological Sciences not elsewhere classified
Chemical Sciences not elsewhere classified
structural deformation control
practical engineering verification
original design value
bridge construction control
elevation error generated
current cantilever elevation
bridge construction based
correction </ p
method based
design state
current section
construction process
actual construction
reasonable elevation
elevation error
elevation caused
next cantilever
bridge structure
bridge deviate
time interval
subsequent cantilevers
results show
paper proposes
main girder
linear shape
internal condition
error analysis
ensure safety
constructed bridges
30 mm
20 mm
Tags: Add Tag
No Tags, Be the first to tag this record!
  • Holdings
  • Description
  • Comments
  • Similar Items
  • Staff View

Similar Items

  • Photographs of construction bridges and locations of monitoring points.
    by: Juan Li (146180)
    Published: (2025)
  • The construction control process of bridge deformation based on parameter identification and error analysis.
    by: Juan Li (146180)
    Published: (2025)
  • S8 and S9 Figs - Structural deformation control in bridge construction based on error analysis and correction
    by: Juan Li (146180)
    Published: (2025)
  • Measured and theoretical elevations with error corrected of cantilevers LL5 ∼ LL20 after pouring during the construction of the left-side bridge.
    by: Juan Li (146180)
    Published: (2025)
  • Measured and theoretical elevations with error corrected of cantilevers LL5 ∼ LL20 after tensioning prestressing steel during the construction of the left-side bridge.
    by: Juan Li (146180)
    Published: (2025)

Find More

  • Browse the Catalog
  • Browse Alphabetically
  • Explore Channels
  • Course Reserves
  • New Items
Cannot write session to /tmp/vufind_sessions/sess_0g4pb3201fm97c8e8tpi9s8pjp