The curved compliant anchor combined with the currently used pedicle screws is placed in four steps: 1) Create the pilot hole, 2) place the anchor, 3) advance the curved compliant anchor and 4) fixate the curved compliant anchor.
<p>The curved compliant anchor combined with the currently used pedicle screws is placed in four steps: 1) Create the pilot hole, 2) place the anchor, 3) advance the curved compliant anchor and 4) fixate the curved compliant anchor.</p>
محفوظ في:
| المؤلف الرئيسي: | |
|---|---|
| مؤلفون آخرون: | , , |
| منشور في: |
2024
|
| الموضوعات: | |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|