Neidio i'r cynnwys
VuFind
  • Mewngofnodi
    • English
    • Deutsch
    • Español
    • Français
    • Italiano
    • 日本語
    • Nederlands
    • Português
    • Português (Brasil)
    • 中文(简体)
    • 中文(繁體)
    • Türkçe
    • עברית
    • Gaeilge
    • Cymraeg
    • Ελληνικά
    • Català
    • Euskara
    • Русский
    • Čeština
    • Suomi
    • Svenska
    • polski
    • Dansk
    • slovenščina
    • اللغة العربية
    • বাংলা
    • Galego
    • Tiếng Việt
    • Hrvatski
    • हिंदी
    • Հայերէն
    • Українська
    • Sámegiella
    • Монгол
Uwch
  • S1 File - Application of enhan...
  • Dyfynnu hwn
  • Anfonwch hwn fel neges destun
  • E-bostio hwn
  • Argraffu
  • Allforio Cofnod
    • Allforio i RefWorks
    • Allforio i EndNoteWeb
    • Allforio i EndNote
  • Ychwanegu at ffefrynnau
  • Permanent link
S1 File - Application of enhanced benders decomposition algorithm in circular assembly line balancing problem with task splitting

S1 File - Application of enhanced benders decomposition algorithm in circular assembly line balancing problem with task splitting

<p>The raw statistical data underlying the key figures and tables.</p> <p>(ZIP)</p>

Wedi'i Gadw mewn:
Manylion Llyfryddiaeth
Prif Awdur: Panfei Li (22379086) (author)
Awduron Eraill: Chongxing Ji (22379089) (author)
Cyhoeddwyd: 2025
Pynciau:
Biotechnology
Sociology
Space Science
Information Systems not elsewhere classified
significant technological innovation
rigorous linearization theorem
rapid solution screening
improving solution quality
enhanced benders decomposition
enhanced benders cuts
balancing master problem
assembly line marked
ablation studies confirm
numerous manufacturing enterprises
heuristic infeasibility proof
8 %, 69
collaborative task execution
manufacturing industry
infeasibility analysis
2 %,
xlink ">
world instances
station revisitation
production system
process assignment
position machines
paper introduces
novel np
loop topology
local branching
handling spatio
extensively adopted
dimensional complexity
checking subproblem
addressing worker
7 %.
60 real
3 %.
Tagiau: Ychwanegu Tag
Dim Tagiau, Byddwch y cyntaf i dagio'r cofnod hwn!
  • Daliadau
  • Disgrifiad
  • Sylwadau
  • Eitemau Tebyg
  • Dangos Staff

Eitemau Tebyg

  • Top-down vs. bottom-up benders decomposition strategies.
    gan: Panfei Li (22379086)
    Cyhoeddwyd: (2025)
  • Layout example of circular assembly line balancing problem.
    gan: Panfei Li (22379086)
    Cyhoeddwyd: (2025)
  • The pseudo code of solving procedure with enhanced benders cut.
    gan: Panfei Li (22379086)
    Cyhoeddwyd: (2025)
  • Schematic diagram of process assignment with task-splitting.
    gan: Panfei Li (22379086)
    Cyhoeddwyd: (2025)
  • Layout transition diagram of production line stations: circular to straight configuration.
    gan: Panfei Li (22379086)
    Cyhoeddwyd: (2025)

Opsiynau Chwilio

  • Hanes Chwilio
  • Chwiliad Uwch

Canfod Mwy

  • Pori'r Catalog
  • Pori yn ôl y Wyddor
  • Archwiliwch Sianeli
  • Cronfeydd y Cwrs
  • Eitemau Newydd

Angen Help?

  • Awgrymiadau Chwilio
  • Gofynnwch i Lyfrgellydd
  • Cwestiynau Cyffredin