Outage probability versus the transmit power budget, with N = 5, = 5, m = 1, = 5 [dBm] and = = 1.5 [BPCU].

<p>Outage probability versus the transmit power budget, with N = 5, = 5, m = 1, = 5 [dBm] and = = 1.5 [BPCU].</p>

Shranjeno v:
Bibliografske podrobnosti
Glavni avtor: Minh Tran (7698803) (author)
Drugi avtorji: Minh Bui Vu (22683661) (author), Sang Quang Nguyen (22683664) (author)
Izdano: 2025
Teme:
Oznake: Označite
Brez oznak, prvi označite!