Multiple Plants Capacitated Lot Sizing and Scheduling with Sequence-Dependent Setup Costs
A Master of Science thesis in Engineering Systems Management by Sari Hilmi Abdullah entitled, "Multiple Plants Capacitated Lot Sizing and Scheduling with Sequence-Dependent Setup Costs," submitted in November 2016. Thesis advisor is Dr. Abdulrahim Shamayleh and thesis co-advisor is Dr. Mal...
Saved in:
| Main Author: | Abdullah, Sari Hilmi (author) |
|---|---|
| Format: | doctoralThesis |
| Published: |
2016
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/11073/8705 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Integrated Material Lot Sizing and Multi-Resource Leveling Models with Activity Splitting
by: Almatroushi, Hessa
Published: (2015) -
Residential Demand Response Scheduling with Consideration of Consumer Preferences
by: Raka Jovanovic (17947838)
Published: (2016) -
Optimizing Energy Consumption of Cloud Computing IaaS
by: Mohamed, Huda Ibrahim
Published: (2017) -
Optimization of Energy Consumption in Cloud Computing Datacenters
by: Osman, Ahmed Osman
Published: (2018) -
Optimal Management of Mobile Energy Generation and Storage Systems
by: Samara, Sarra Mahmoud
Published: (2018)