Multi-Mode Resource Constrained Project Scheduling Problem with Material Ordering to Maximize NPV

A Master of Science thesis in Engineering Systems Management by Nour Ahmed Kashwani entitled, “Multi-Mode Resource Constrained Project Scheduling Problem with Material Ordering to Maximize NPV”, submitted in April 2018. Thesis advisor is Dr. Abdulrahim Shamayleh. Soft and hard copy available.

Saved in:
Bibliographic Details
Main Author: Kashwani, Nour Ahmed (author)
Format: doctoralThesis
Published: 2018
Subjects:
Online Access:http://hdl.handle.net/11073/16221
Tags: Add Tag
No Tags, Be the first to tag this record!