Multi-Mode Resource Constrained Project Scheduling Problem with Material Ordering to Maximize NPV

A Master of Science thesis in Engineering Systems Management by Nour Ahmed Kashwani entitled, “Multi-Mode Resource Constrained Project Scheduling Problem with Material Ordering to Maximize NPV”, submitted in April 2018. Thesis advisor is Dr. Abdulrahim Shamayleh. Soft and hard copy available.

محفوظ في:
التفاصيل البيبلوغرافية
المؤلف الرئيسي: Kashwani, Nour Ahmed (author)
التنسيق: doctoralThesis
منشور في: 2018
الموضوعات:
الوصول للمادة أونلاين:http://hdl.handle.net/11073/16221
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
_version_ 1864513433449267200
author Kashwani, Nour Ahmed
author_facet Kashwani, Nour Ahmed
author_role author
dc.contributor.none.fl_str_mv Shamayleh, Abdulrahim
dc.creator.none.fl_str_mv Kashwani, Nour Ahmed
dc.date.none.fl_str_mv 2018-09-10T05:25:55Z
2018-09-10T05:25:55Z
2018-04
dc.format.none.fl_str_mv application/pdf
dc.identifier.none.fl_str_mv 35.232-2018.18
http://hdl.handle.net/11073/16221
dc.language.none.fl_str_mv en_US
dc.subject.none.fl_str_mv Resource-Constrained
Material Ordering
Project Management
Heuristics
dc.title.none.fl_str_mv Multi-Mode Resource Constrained Project Scheduling Problem with Material Ordering to Maximize NPV
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/doctoralThesis
description A Master of Science thesis in Engineering Systems Management by Nour Ahmed Kashwani entitled, “Multi-Mode Resource Constrained Project Scheduling Problem with Material Ordering to Maximize NPV”, submitted in April 2018. Thesis advisor is Dr. Abdulrahim Shamayleh. Soft and hard copy available.
format doctoralThesis
id aus_fe40ea7d105d61ce5834d711bcbb6348
identifier_str_mv 35.232-2018.18
language_invalid_str_mv en_US
network_acronym_str aus
network_name_str aus
oai_identifier_str oai:repository.aus.edu:11073/16221
publishDate 2018
repository.mail.fl_str_mv
repository.name.fl_str_mv
repository_id_str
spelling Multi-Mode Resource Constrained Project Scheduling Problem with Material Ordering to Maximize NPVKashwani, Nour AhmedResource-ConstrainedMaterial OrderingProject ManagementHeuristicsA Master of Science thesis in Engineering Systems Management by Nour Ahmed Kashwani entitled, “Multi-Mode Resource Constrained Project Scheduling Problem with Material Ordering to Maximize NPV”, submitted in April 2018. Thesis advisor is Dr. Abdulrahim Shamayleh. Soft and hard copy available.Project management is critical for companies to stay competitive; nowadays it is regarded as a very high priority. The project management scheduling process of deciding when an activity starts and how resources will be used will highly impact the project duration and cost. A realistic schedule will minimize the chances of failure. Traditionally, the objective of makespan minimization to plan the overall project has been the concept; however, it is critical to incorporate the financial aspect of the project and schedule the activities in such a way that will maximize the net present value (NPV). In this thesis, a mathematical model for the multi-mode resource-constrained project scheduling problem with material ordering to maximize the net present value (MMRCPSPMO) is developed. The model is subjected to precedence, deadline, renewable and non-renewable resources and capital availability constraints. In addition, penalties are imposed in case of any delays. Project scheduling and material ordering decisions are emphasized to determine the time and quantity of an order because setting the material ordering decisions after the project scheduling phase leads to non-optimal solutions. A sensitivity analysis has been performed on the model to see the effect of varying the ordering costs, holding costs and network sizes and complexities. In addition, the variation of both holding and ordering costs at the same time has been performed. The analysis results showed that once the ordering cost is increased, the objective function is affected and hence, the model tends to minimize the overall material orders placed in order to obtain the maximum desired NPV. On the other hand, when the holding cost increases, the model tends to reduce the inventory stored and order the desired materials when needed to avoid storing inventory with high holding costs and longer durations. Furthermore, sensitivity analysis has been performed on 86 different networks with varied sizes of 7, 10, 12, 14, 16, 18, 20, 22 and 25 with a network complexity of 0.2, 0.4, 0.6 and 0.8. The results generated have shown that once the project’s network reaches 20 activities with a network complexity of 0.8, the model tends to take a long computational time; therefore, a heuristic approach is developed in order to minimize the computational time for large size projectsCollege of EngineeringDepartment of Industrial EngineeringMaster of Science in Engineering Systems Management (MSESM)Shamayleh, Abdulrahim2018-09-10T05:25:55Z2018-09-10T05:25:55Z2018-04info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/doctoralThesisapplication/pdf35.232-2018.18http://hdl.handle.net/11073/16221en_USoai:repository.aus.edu:11073/162212025-06-26T12:25:55Z
spellingShingle Multi-Mode Resource Constrained Project Scheduling Problem with Material Ordering to Maximize NPV
Kashwani, Nour Ahmed
Resource-Constrained
Material Ordering
Project Management
Heuristics
status_str publishedVersion
title Multi-Mode Resource Constrained Project Scheduling Problem with Material Ordering to Maximize NPV
title_full Multi-Mode Resource Constrained Project Scheduling Problem with Material Ordering to Maximize NPV
title_fullStr Multi-Mode Resource Constrained Project Scheduling Problem with Material Ordering to Maximize NPV
title_full_unstemmed Multi-Mode Resource Constrained Project Scheduling Problem with Material Ordering to Maximize NPV
title_short Multi-Mode Resource Constrained Project Scheduling Problem with Material Ordering to Maximize NPV
title_sort Multi-Mode Resource Constrained Project Scheduling Problem with Material Ordering to Maximize NPV
topic Resource-Constrained
Material Ordering
Project Management
Heuristics
url http://hdl.handle.net/11073/16221