A risk-adjusted decoupled-net-present-value model to determine the optimal concession period of BOT projects
Purpose The net-present-value (NPV) method is well-known for its drawbacks. To overcome some of these NPV weaknesses this paper aims to provide a methodology to determine an optimal concession period that treats risk and time separately. The purpose of this paper is to apply the notion of risk-adjus...
Saved in:
| Main Author: | |
|---|---|
| Other Authors: | , |
| Published: |
2020
|
| Subjects: | |
| Online Access: | https://bspace.buid.ac.ae/handle/1234/2382 https://doi.org/10.1108/BEPAM-12-2019-0134 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|