Delay to Projects - Cause, Effect and Measures to Reduce/Eliminate Delay by Mitigation/Acceleration
Delay to projects is one of the foremost concerns of the construction industry in the United Arab Emirates. The delays to the projects are affecting the economies throughout the world. Delay to projects mean the slowdown of development in all other related fields. The main aim and objective of this...
محفوظ في:
| المؤلف الرئيسي: | Saeed, Shaikh Asif Abdus (author) |
|---|---|
| منشور في: |
2009
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://bspace.buid.ac.ae/handle/1234/234 |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Developing a Stochastic Model to Predict Cost Overrun due to the Causes of Projects Delay in Oil Fields Construction Industry
حسب: ALKHOORI, KHALID ABDUL MAJEED
منشور في: (2020) -
Root Causes of Delays in the Construction Projects in the UAE Public Sector and the Client’s Project Manager role in Mitigation
حسب: ATOUT, SAMI MAMOON MOUSA
منشور في: (2021) -
Solar PV Construction Project Delays and Mitigation Strategies to Enhance Projects Timeline Performance A case study From Dubai’s Environment
حسب: AL-KHALIDI, ABDULRAHMAN BASIL
منشور في: (2022) -
Causes of Delay in Construction Projects In Abu Dhabi
حسب: ur Rehman, Ghias
منشور في: (2015) -
LEGAL ANALYSIS OF CONCURRENT DELAY CLAIMS IN CONSTRUCTION PROJECTS AND EVALUATION OF ENTITLEMENT USING APPORTIONMENT PRINCIPLE
حسب: JOSEPH, BINU
منشور في: (2015)