An Uncertainty Based Genetic Algorithm Approach for Project Resource Scheduling
This research is tackling the issue of complex resources scheduling in project management. In traditional planning tools, resource allocation is sequence based. This normally results in a very simple baseline schedule. However, in reality, the problem of project scheduling is more complex and it dep...
Saved in:
| Main Author: | ALKETBI, SAIF (author) |
|---|---|
| Published: |
2016
|
| Subjects: | |
| Online Access: | http://bspace.buid.ac.ae/handle/1234/1024 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The attitude of project managers toward using Microsoft project for planning and scheduling. (c1997)
by: Yafawi, Khalil Ibrahim
Published: (1997) -
Integrated Material Lot Sizing and Multi-Resource Leveling Models with Activity Splitting
by: Almatroushi, Hessa
Published: (2015) -
Project Crisis Management Techniques to Overcome the Problems of Schedule Delays and Cost Overruns
by: Halloum, Mohammad
Published: (2010) -
Efficient Dynamic Cost Scheduling Algorithm for Data Batch Processing
by: Al Sadawi, Alia
Published: (2016) -
Multi-Mode Resource Constrained Project Scheduling Problem with Material Ordering to Maximize NPV
by: Kashwani, Nour Ahmed
Published: (2018)