Developing an Integrated BIM Process for real-time Environmental impact Assessment as per LEED v4 and COBie Requirements
DISSERTATION WITH DISTINCTION
Saved in:
| Main Author: | Jabbour, Toufik (author) |
|---|---|
| Published: |
2015
|
| Subjects: | |
| Online Access: | http://bspace.buid.ac.ae/handle/1234/886 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
BUILDING INFORMATION MODELING (BIM) Principles, Usage, Benefits and Challenges for its application in the Kingdom of Saudi Arabia (KSA)
by: AWAD, IBRAHIM
Published: (2017) -
BIM for Economic Green Retrofitting based on LEED- EBOM
by: MEREB, EMAN
Published: (2020) -
Effects of BIM in Enhancing Prefabricated Construction
by: Sherra, Abdelrahman Mohamed Ezzat
Published: (2021) -
The Impact of the BIM Organizational Risks on the BIM Enhanced Project Delivery and Organization Improvement
by: BARAKEH, KAMAL IBRAHIM
Published: (2017) -
Measuring Sustainability in Design for Hospitality
by: Zimmer, Teresa Marie
Published: (2011)